Safety Glass
Produced to TS EN 12150 (toughened) and TS EN 14449 (laminated) safety-glass standards.

CompletedRize
A disaster-management campus on a 27,400 m² site
Overview
The Rize Disaster and Emergency Management Centre was delivered between 2017 and 2019 for TOKİ, with AFAD as beneficiary.
9,965 m² of built area sits on a 27,400 m² site. Stepping down the steep Black Sea topography, the campus houses administrative buildings, extensive training and simulation areas, and uninterrupted coordination infrastructure.
Overview
Administrative, training and operational units built as one campus to strengthen disaster-management infrastructure.




Management and administration offices from which disaster operations are run.
Areas laid out for emergency response, simulation and staff/public training.
Uninterrupted coordination infrastructure, logistics stores and search-and-rescue units.
Campus infrastructure, access routes and landscaping completed within the contract.

The Rize Disaster and Emergency Management Centre, planned to TOKİ standards with administrative buildings, training areas and operational units.
The corporate project plaque glazing was manufactured to TOKİ and AFAD standards.
Produced to TS EN 12150 (toughened) and TS EN 14449 (laminated) safety-glass standards.
6 mm toughened solar-control glass + 16 mm spacer + 6 mm toughened laminated glass.
UV-resistant screen / ceramic frit digital printing for exterior use.
Stainless-steel spider fixings on a point-fixed aluminium cassette facade system.
Location
The campus steps down the steep slopes of the Black Sea coast.
The steep topography shaped the stepped layout and the retaining solutions.
The campus connects directly to the coastal route and the provincial network.
High rainfall drove the facade and roof detailing.
Gallery
Other projects

Kahramanmaraş

Kızık Mah., Manyas / Balıkesir

Cami Mah., Tutak / Ağrı
Our sales and information office is open weekdays 09:00 – 18:00. Call us for project details, a price list or an appointment.