HYB Grup İnşaat
All projects

Kahramanmaraş AFAD Building

CompletedKahramanmaraş

27,110 m² built on an 87,750 m² site

27,110 m²Built Area87,750 m²Site AreaAFADBeneficiary
Scroll

Overview

27,110 m² built on an 87,750 m² site

The Kahramanmaraş Provincial AFAD Service Building was delivered for TOKİ, with AFAD as beneficiary.

With 27,110 m² built on an 87,750 m² site, it is the largest of the AFAD campuses we have delivered. Administrative buildings, emergency training areas, operational units and site infrastructure were completed under a single programme.

Overview

Building Programme

Administrative, training and operational units built as one campus to strengthen disaster-management infrastructure.

Building Programme
Building Programme
Building Programme
Building Programme
01

Administrative Buildings

Management and administration offices from which disaster operations are run.

02

Training Areas

Areas laid out for emergency response, simulation and staff/public training.

03

Operational Units

Uninterrupted coordination infrastructure, logistics stores and search-and-rescue units.

04

Site Infrastructure

Campus infrastructure, access routes and landscaping completed within the contract.

27,110 m² built on an 87,750 m² site

27,110 m² built on an 87,750 m² site

The Kahramanmaraş Provincial Disaster and Emergency Directorate building — our largest AFAD campus, with administrative, training and operational units.

Facade and Plaque Glazing

The corporate project plaque glazing was manufactured to TOKİ and AFAD standards.

01

Safety Glass

Produced to TS EN 12150 (toughened) and TS EN 14449 (laminated) safety-glass standards.

02

Glass Build-up

6 mm toughened solar-control glass + 16 mm spacer + 6 mm toughened laminated glass.

03

Print Technology

UV-resistant screen / ceramic frit digital printing for exterior use.

04

Support System

Stainless-steel spider fixings on a point-fixed aluminium cassette facade system.

Location

Central Kahramanmaraş

The campus was built on a large central site, scaled to carry the province's disaster response capacity.

  • Large Site

    The 87,750 m² site was planned to leave room for open training and exercise areas.

  • Regional Role

    Sized with regional response capacity in mind, given its position on the fault zone.

  • Operations

    Open areas for logistics stores and the vehicle fleet sit within the campus.

Gallery

Kahramanmaraş AFAD Building

4 photos

Other projects

What we build

Let the next project be yours

Our sales and information office is open weekdays 09:00 – 18:00. Call us for project details, a price list or an appointment.